{"id":1944,"date":"2026-04-29T14:26:09","date_gmt":"2026-04-29T14:26:09","guid":{"rendered":"https:\/\/panleen.com\/?p=1944"},"modified":"2026-04-30T12:02:03","modified_gmt":"2026-04-30T12:02:03","slug":"panleen-lda-conquista-adjudicacao-de-projecto-estrategico-de-abastecimento-de-agua-em-chimoio","status":"publish","type":"post","link":"https:\/\/panleen.com\/en\/2026\/04\/29\/panleen-lda-conquista-adjudicacao-de-projecto-estrategico-de-abastecimento-de-agua-em-chimoio\/","title":{"rendered":"PANLEEN, Lda. wins award for strategic water supply project in Chimoio"},"content":{"rendered":"<p>The FIPAG - Water Supply Investment and Asset Fund has awarded PANLEEN the contract for the rehabilitation works of the Bairro 4 Distribution Centre (DC) and the completion of the water transmission pipeline between the Bairro 4 DC and the Elevated Water Reservoir of Textafrica, in the city of Chimoio.<\/p>\n\n\n\n<p>The project is funded by the World Bank and represents a strategic intervention to strengthen the water supply system in the province of Manica.<\/p>\n\n\n\n<p>The award confirms PANLEEN as a leading company in the execution of works of high public importance, distinguished by its technical capacity, operational excellence, and commitment to modern engineering standards.<\/p>\n\n\n\n<p>With this new challenge, PANLEEN once again positions itself as a strategic partner in the development of essential infrastructure in Mozambique, ensuring durable and efficient solutions.<\/p>\n\n\n\n<p>The works will focus on the rehabilitation of the Bairro 4 Distribution Centre, a key infrastructure for managing the water supply network, as well as the completion of the water transmission pipeline to the Elevated Reservoir of Textafrica.<\/p>\n\n\n\n<p>The intervention will provide greater operational stability, improved network pressure, and increased water distribution capacity for several areas of the city of Chimoio.<\/p>\n\n\n\n<p>With the implementation of the project, thousands of families are expected to benefit from a more efficient, regular, and reliable water supply system.<\/p>\n\n\n\n<p>Improved access to potable water will have a direct impact on public health, community hygiene, and the well-being of the population, while also strengthening the city\u2019s capacity to respond to urban growth. This project represents another important step in strengthening the country\u2019s public infrastructure, reinforcing the commitment of FIPAG - Water Supply Investment and Heritage Fund and the World Bank to sustainable solutions for the water sector.<\/p>\n\n\n\n<p>In this context, PANLEEN stands out as a key player in the technical execution of transformative projects, reaffirming its ability to deliver works of high impact and strategic value for Mozambique.<\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>O FIPAG &#8211; Fundo de Investimento e Patrim\u00f3nio do Abastecimento de \u00c1gua adjudicou \u00e0 empresa PANLEEN a execu\u00e7\u00e3o das obras de reabilita\u00e7\u00e3o do Centro Distribuidor (CD) do Bairro 4 e conclus\u00e3o da conduta de transporte de \u00e1gua entre o CD do Bairro 4 e o Reservat\u00f3rio de \u00c1gua Elevado da Textafrica, na cidade de Chimoio. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1946,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-1944","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sistemas-de-abastecimento-de-agua"],"_links":{"self":[{"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/posts\/1944","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/comments?post=1944"}],"version-history":[{"count":2,"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/posts\/1944\/revisions"}],"predecessor-version":[{"id":1965,"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/posts\/1944\/revisions\/1965"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/media\/1946"}],"wp:attachment":[{"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/media?parent=1944"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/categories?post=1944"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/panleen.com\/en\/wp-json\/wp\/v2\/tags?post=1944"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}